Evergy substation project: 10,742 miles… 221 sites… in 8 weeks? Sure, we can do that.
By Neal Bellamy, IT Director at Kenton Brothers Last September, evergy approached us about a project that would add access control to 221 of their remote locations. The remote locations have been built over a period of more than fifty years with various locking hardware at each location. So, the mission was to go loaded […]